Anthony Molis
Forum Replies Created
-
In reply to: Inspection requirements
April 15, 2022 at 7:28 am #40136Ian
Hope this helps it is a couple of years old. This was my checklist.
Tony Molis
<table width=”838″>
<tbody>
<tr>
<td width=”188″>REPORT / INSPECTION</td>
<td width=”123″>AGENCY</td>
<td width=”122″>FREQUENCY</td>
<td width=”95″>CURRENT</td>
<td width=”159″>NEXT DUE</td>
<td width=”151″>CONTACT INFO</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>ACID TANK PUMPING</td>
<td></td>
<td>ONCE A YEAR AS</td>
<td>OCT. 2018</td>
<td></td>
<td>R. B. OUR</td>
</tr>
<tr>
<td></td>
<td></td>
<td>NEEDED</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>AHERA</td>
<td></td>
<td>EVERY 6 MONTHS</td>
<td>OCT. 2018</td>
<td>JUNE. 2019</td>
<td></td>
</tr>
<tr>
<td>AHERA REPORT UPDATE</td>
<td></td>
<td>EVERY 3 YEARS</td>
<td>DEC. 2017</td>
<td>DEC. 2020</td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan=”2″>AHERA 2 HOUR TRAINING RENUAL</td>
<td>ANNUAL</td>
<td>APRIL. 2012</td>
<td>Per Marina not needed</td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>BOILERS / AIR COMPRESSORS</td>
<td>TRAVELERS INS.</td>
<td>ANNUAL</td>
<td>July. 2017</td>
<td>July. 2018</td>
<td>CHRIS MORRIS</td>
</tr>
<tr>
<td></td>
<td>STATE MA</td>
<td></td>
<td></td>
<td></td>
<td>$50 EACH CERTIFICATE</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>BTU CALIBRATION</td>
<td>PER NEXANT</td>
<td>EVERY 2 YEARS</td>
<td>2012</td>
<td>2014</td>
<td>NEED A CONTRACTOR</td>
</tr>
<tr>
<td>NO LONGER NEEDED</td>
<td>TRIGEN DOWN</td>
<td></td>
<td></td>
<td></td>
<td>TO PERFORM</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>BUILDING INSPECTOR</td>
<td>HARWICH BLDG.DP</td>
<td>ANNUAL</td>
<td>AUG. 2018</td>
<td>AUG. 2019</td>
<td>JAY BRIGGS AS OF 2016</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CHEMICAL INVENTORY</td>
<td>3 RD FLOOR CLOSET</td>
<td>MAINTAINED</td>
<td>BY</td>
<td>AVE’ GAFFNEY</td>
<td></td>
</tr>
<tr>
<td></td>
<td>DONE BY EPA</td>
<td></td>
<td></td>
<td></td>
<td>DWIGHT PEAVEY</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>DELUGE SHOWERS</td>
<td></td>
<td>WEEKLY</td>
<td></td>
<td></td>
<td>2ND SHIFT CUSTODIANS</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>ELEVATOR</td>
<td>Dept. Public Safety</td>
<td>ANNUAL</td>
<td>OCT. 2018</td>
<td>SEPT. 2019</td>
<td>per state</td>
</tr>
<tr>
<td colspan=”3″>ELEVATOR DONE THRU CONTRACT BY BUCKLEY ELEVATOR</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>EYE WASH STATIONS</td>
<td></td>
<td>WEEKLY</td>
<td></td>
<td></td>
<td>2ND SHIFT CUSTODIANS</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FIRE ALARMS</td>
<td>T C LIFE SAFETY</td>
<td>BI ANNUAL</td>
<td>AUG. 2018</td>
<td>FEB. 2019</td>
<td>MIKE AGRI</td>
</tr>
<tr>
<td colspan=”4″>WHEN SCHEDULING FIRE ALARM TESTS BE SURE TO SCHEDULE ANSEL SYSTEM TESTS.</td>
<td></td>
<td></td>
</tr>
<tr>
<td>FIRE ANSEL SYSTEMS</td>
<td></td>
<td>BI-ANNUAL</td>
<td>AUG. 2018</td>
<td>FEB. 2019</td>
<td>RALPH PERRY</td>
</tr>
<tr>
<td>KITCHEN AND WELDING</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FIRE EXTINGUISHERS</td>
<td></td>
<td>MONTHLY</td>
<td></td>
<td></td>
<td>2ND SHIFT CUSTODIANS</td>
</tr>
<tr>
<td></td>
<td></td>
<td>ANNUAL</td>
<td>Aug. 2018</td>
<td>Aug. 2019</td>
<td>RALPH PERRY</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FIRE INSPECTION</td>
<td>HARWICH FIRE</td>
<td>BI ANNUAL</td>
<td>Aug. 2018</td>
<td>Feb. 2019</td>
<td>LT. COUGHLIN</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FIRE SPRINKLER</td>
<td>CANCO</td>
<td>ANNUAL</td>
<td>Aug. 2018</td>
<td>AUG. 2019</td>
<td>RICK</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FORK LIFT INSPECTION</td>
<td colspan=”2″>OCEAN STATE FORKLIFT</td>
<td>JULY . 2018</td>
<td>JULY. 2019</td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>FORK LIFT LICENSE</td>
<td>STATE LICENSE</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>GAS METER CALIBRATION</td>
<td>PER NEXANT</td>
<td>NATIONAL GRID</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>GREASE TRAPS</td>
<td>COASTAL ENGINEERING</td>
<td>PER INSPECTION</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>GYM INSPECTION</td>
<td>GYM SPECIALISTS INC</td>
<td>ANNUAL</td>
<td>FEB. 2014</td>
<td>FEB. 2015</td>
<td>MATT DIAMOND</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>HOISTS 2 MARINE / WELDING</td>
<td>AMERICAN CRANE</td>
<td>ANNUAL</td>
<td>July. 2018</td>
<td>July. 2019</td>
<td>AMERICAN CRANE</td>
</tr>
<tr>
<td>HOIST LICENSE</td>
<td>STATE LICENSE</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>IPM PLAN INTEGRATED PEST</td>
<td>MASS MDAR</td>
<td>ANNUAL UPDATE</td>
<td>JUNE. 2018</td>
<td>JUNE. 2019</td>
<td>ONLINE FORM</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>KITCHEN HOOD CLEANING</td>
<td>INTEGRITY TOTAL</td>
<td>ANNUAL</td>
<td>Aug. 2018</td>
<td>Aug. 2019</td>
<td>JOE</td>
</tr>
<tr>
<td>6 MONTH RE-INSPECTION</td>
<td></td>
<td></td>
<td>180 DAYS OUT</td>
<td>FEB. 2019</td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>LEAD PAINT</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>Tested ECE 3/8/2012</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>MA AIR SOURCE REPORT</td>
<td>DEP</td>
<td>EVERY 3 YEARS *</td>
<td>Dec. 2012</td>
<td>N/ A UNLESS CHANGES</td>
<td>MARK WERT ( SEE FILE )</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>MDC TRAPS</td>
<td>DEP</td>
<td>EVERY 6 MONTHS</td>
<td>OCT. 2018</td>
<td>Jun-19</td>
<td>MARINA BROCK</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>SAFETY KLEEN HELPS</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>PLAYGROUND</td>
<td>NORTHEAST PLAYGROUND BUILDERS</td>
<td>ANNUAL</td>
<td>March. 2014</td>
<td>March. 2015</td>
<td>CHRISSY</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>RADIO STATION</td>
<td>FCC</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>HANDHELD RADIO LICENSE</td>
<td>CAPE ELECTRONICS</td>
<td>ANNUAL</td>
<td>MARCH. 2013</td>
<td>MAY. 2023</td>
<td>TERRI STOCKDALE</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>CAPE ELECTRONICS</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>SCISSOR LIFT INSPECTION</td>
<td>UNITED RENTALS</td>
<td>ANNUAL</td>
<td>MAR. 2018</td>
<td>MAR. 2019</td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>SCISSOR LIFT TRAINING</td>
<td>CRANES 101</td>
<td>LIFETIME</td>
<td>DEC. 2013</td>
<td>NEXT TIME SHOPS</td>
<td>CRANES 101</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>WANT TO SCHEDULE</td>
<td>BELLINGHAM</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>SEPTIC SYSTEMS</td>
<td>COASTAL ENGINEERING</td>
<td>ANNUAL</td>
<td>AUG. 2018</td>
<td>AUG. 2019</td>
<td>JOHN SCHNAIBLE</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>SEPTIC TANK PUMPOUT</td>
<td colspan=”2″>PER COASTAL ENG.</td>
<td>OCT. 2018</td>
<td></td>
<td>R. B. OUR</td>
</tr>
<tr>
<td>PER ANNUAL INSPECTIONS</td>
<td>INSPECTION</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>STAND PIPE CABINETS</td>
<td></td>
<td>MONTHLY</td>
<td>OCT. 2018</td>
<td>CLEANED</td>
<td>2ND SHIFT CUSTODIANS</td>
</tr>
<tr>
<td>AT STAIRWELLS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>TIER 2 REPORT</td>
<td>1 COPY TO FIRE DEPT</td>
<td>EVERY YEAR</td>
<td>Dec. 2017</td>
<td>MARCH 1ST EACH YEAR</td>
<td>AMY ALATI</td>
</tr>
<tr>
<td>COMPUTER PROGRAM</td>
<td>1 COPY TO EPA</td>
<td></td>
<td>filed for 3/18</td>
<td></td>
<td>BARNSTABLE COUTY</td>
</tr>
<tr>
<td>COMES OUT DECEMBER</td>
<td colspan=”2″>1 COPY TO AMY WALLACE</td>
<td></td>
<td></td>
<td>HEALTH DEPT</td>
</tr>
<tr>
<td>EACH YEAR</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>WHEEL CHAIR LIFT ?</td>
<td></td>
<td>ANNUAL ?</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
</tbody>
</table>In reply to: Desks…..Used or New
July 15, 2020 at 10:05 am #37213Ryan
I still have a few in a building that is going to get torn down.
Tony Molis
Cape Cod Regional Tech
cell508-240-4462
In reply to: Auditorium renovation/seating vendor
February 10, 2020 at 7:24 am #36640Bob
We installed about 140 seats back in 2011 these are going to be torn out when we demo the building. Do you want them? We got them from a movie theatre that was recently renovated just 2 years before we obtained them. We had a Beau’s Seating install them Richard Beau Bibeau Cell 508-269-6762 or business line 508-676-0706 they were recommended by Lord Seating.
Feel free to call me on my cell 508-240-4462
Tony Molis Cape Cod Regional Tech Harwich.
In reply to: Custodial OT Pay
December 9, 2019 at 11:15 am #36450Ed
Our custodians are covered under a union. We pay time and 1/2 for over 40. Sundays are still time and 1/2 after 40. Holidays they say are double time but if they work or not they get holiday pay. So when they work they only get an additional straight time pay for hours worked. One of my pet peeves since all other jobs I ever worked we got double time plus the holiday pay.
Tony Molis Cape Cod Tech.
In reply to: Facilities Utility Vehicle
November 26, 2019 at 5:43 pm #36418We just got a Ford Ranger took me a full year to convince our district to purchase
we are a tech school so we did not need another plow vehicle we already have 2 Skid steers and a big dump trucks
finally got it for running errands and picking up motors and hardware store supplies runs
Tony Molis
cape cod tech
Our school nurse inspects them but we change out the expired pads and batteries in maintenance
Tony Molis
Cape Cod Regional Tech
In reply to: Elusive Musty Odor
August 14, 2019 at 8:38 am #35863On the same note as open sewer vent pipes remember to top off all sink traps as they will dry out and leak gases back. We have a lot of classrooms where they no longer use the sinks and have covered them with a sheet of plywood for more storage counters which tend to add to the find the odor game.
Tony Molis
Cape Cod Tech Harwich
In reply to: 2019-2020 Vape Prevention Grant: FlySense Vaping Detectors?
May 14, 2019 at 8:17 am #35576Can you forward the information for the Grant? We have installed a few sensors and would like to read about the Grant.
Thanks Tony Molis Cape Cod Tech
In reply to: What are your experiences with auto flush valves on older fixtures?
May 10, 2019 at 6:31 am #35570Our school is plagued with behavioral students that break items non stop. We tried retrofitting the Sloan Valves with just the Auto Flush hands free heads but these didn’t always work well, some leaked. We tried replacing the complete Flushometers with Auto Flush types but find the way the students kick them and destroy them it is just more costly for the replacement, then of course you have to replace batteries. Remember to size them correctly as a low flow Flushometer does not work well with an old 4o year old toilet the older models still need the full flush 3 gallon if you cut back on the flush then you will have clogs in the pipes. Our students clog toilets and urinals with plastic water bottles, apples, bags of carrots, bags of apple slices, handfuls of nuts, bolts, hardware, plumbing fittings and rags they throw full rolls of toilet paper and full rolls of paper towels into the toilets.
Good luck.
Tony Molis Cape Cod Regional Tech Harwich.
In reply to: Class room doors glass windows and window dressing
January 8, 2019 at 2:28 pm #34823Marc
Hope this helps it was sent to me from our fire department. If you want to send me your email I will send you the complete email from my fire inspector it has about 4 pages of references.
Tony Molis
Exit access passageways, corridors and assembly areas:
• Paper materials shall not exceed 10% of any wall area (not the total wall area) in schools without automatic sprinklers and up to 50% of any wall area in schools equipped throughout with automatic sprinklers.
• The maximum grouping of material shall be 12 ft. horizontally and 6ft. vertically. In schools without automatic sprinklers the space between the groups shall be equal to the horizontal width of the largest adjacent group. In schools equipped with automatic sprinklers the space between the groups shall be equal to one half the horizontal width of the largest adjacent group.
• Paper materials are not permitted to cover or be within 5 ft. of an egress door.In reply to: Load Shedding
May 14, 2018 at 2:09 pm #33802A few years back we participated in both Passive and Active load shedding. The Passive was automatic when our Co Gen Plant was running and we made money as long as it was going. It has since self destructed.
The Active Load shed meant we had to turn on our back up generator but the problem was that the call always came in about 2:45 and we would have to pay overtime for the couple of hours we participated. We would make about $75 and pay out about the same in overtime plus the cost of fuel for the generator for the few dollars saved. So not worth the effort.
Tony Cape Cod Tech.
In reply to: Oil buners
May 14, 2018 at 11:09 am #33795We have 3 new Camus Boilers on Natural Gas that are staged by run hours. Recently all 3 units went down and the boiler tech could not figure out what went wrong. The flame rod sensors all failed and none of the new boilers would run. We had one old beast H B Smith on Natural Gas that kicked in and saved us. So there could be that remote possibility that you could lose all 3 depending on your computer controls.
Tony Cape Cod Tech.
In reply to: Door Stops
December 20, 2017 at 2:45 pm #33125Jon
We have the same set up as you do. Our Fire Inspector made us remove all the kick down door stops in the past couple of years. Now my custodians carry a rubber door stop when they clean and vacuum at night so they can prop the door open. They move them as they go to the next room or area.
Tony Cape Cod Tech Harwich.
In reply to: Science Lab Dishwashers
October 25, 2017 at 1:16 pm #32953Try Alconox it is made for lab ware.
We used it when I worked for U-Mass at the Nantucket Field Station
tony
In reply to: Wood Shop Dust Collection System: Service Vendors?
September 21, 2017 at 8:34 am #32735We use a company out of Hanover called Air Cleaning Specialists
Tom Perry 781-826-9755 the guys are great. My unit is manufactured by United Air so I do not know if they work on others but worth a shot.
Tony